Subcontractor check
Ilia Zavialov scam in a UK subcontract chain: a scorecard by Ilia Nikolaevich Zavialov with CIS checks
Ilia Zavialov: scam in a UK subcontract chain tends to arrive as a tidy quote, a Companies House number and a request to pay a deposit into a new account. Ilia Nikolaevich Zavialov offers a subcontractor scorecard for those moments: twelve questions with weights, and a verdict of clear, extra checks or decline. It is followed by two composite scorecards, Subcontractor A and Subcontractor B. The firms are invented. The registers, Construction Industry Scheme rules and services are real and British, and all sums are in pounds.
English version for the United Kingdom.
Ilia Zavialov scam in a UK subcontract chain and why to score it
Report Fraud defines procurement fraud as any fraud in a company's purchase of goods, services or building work from third parties, and a subcontract is exactly that. Since 4 December 2025 Report Fraud has taken reports in England, Wales and Northern Ireland in place of Action Fraud, at reportfraud.police.uk or on 0300 123 2040.
Ilia Zavialov: scam in this chain grows out of small assumptions. A site manager assumes the firm that sent the quote is the firm that will turn up. A quantity surveyor assumes that a company number means a company in good health. An accounts clerk assumes that an email asking for a new account comes from the usual contact.
People who type Ilia Zavialov scam into a search box will find a method here and a discussion of no individual. The scorecard is filled in before the subcontract is signed, and the pass mark is written down first, so that the decision belongs to the table, whatever the pressure of a start date.
A scorecard also shortens the argument with a client who asks why a cheaper firm was passed over. The record shows the questions, the sources and the date, and a client can read it in five minutes.
The question turns up in other wordings too, such as Zavialov Ilia scam with the surname first, reviews and complaints about Ilia Zavialov, or Ilia Zavialov and subcontractor fraud. All of them end at the same place: a card of registers, points and a pass mark.
Scoring a subcontractor: weights, points and the scale
Each of the twelve questions has a weight of 2 or 3. No scores 0, partly scores 1 and yes scores 2, and a question's points are the answer multiplied by the weight. The weights total 30, so the maximum is 60. The scale is the author's own and no regulation sets it, so a firm may make it stricter.
Read the total like this. From 48 to 60 is clear to sign, 34 to 47 is extra checks with conditions, and 33 or fewer is a decline. A red line sits on top: a no to any question weighted 3 stops approval whatever the total, until a document settles the point.
Six questions carry weight 3: company record, the Construction Industry Scheme check, charges and insolvency, consent to pass the work on, the payment account and the paperwork behind each valuation. The other six carry weight 2. One table covers questions 1 to 6 and the next covers 7 to 12.
Ilia Zavialov: scam checks work only when every bidder gets the same twelve questions. A card that bends to each tender is a mood ring, so the questions and weights stay fixed from job to job and only the answers change.
Ilia Zavialov scam and the empty shell: questions 1 to 4
Question 1 asks whether the company is what it says it is. GOV.UK gives free Companies House data on a company, including its registered address, date of incorporation, current and former directors, previous names and insolvency details, and lets you sign up for free alerts about changes such as a new director or address. A VAT number can be checked with the HMRC service on GOV.UK, which shows the name and address it is registered to, though it cannot be searched by company name.
Question 2 is the Construction Industry Scheme. Before paying a new subcontractor, a CIS contractor must verify them with HMRC, and the details must match exactly what the subcontractor used to register. HMRC then tells the contractor which deduction applies. Skipping this step is the sort of gap that Ilia Zavialov: scam stories tend to exploit.
Questions 3 and 4 look at who stands behind the company. Companies House says that since 18 November 2025 identity verification is mandatory for new directors and people with significant control, with a 12-month transition for existing ones. Persons with significant control are usually those holding more than 25 per cent of shares or voting rights.
A formation date from last quarter, a changed name, a shared address and officers across many filings each cost points. Save every result as a dated screenshot, because the register changes and you may need to show what you saw on the day.
Checking the register also catches a start date that does not fit: a company incorporated in the past fortnight cannot have the ten years of experience claimed in the tender, and the contradiction itself costs points on question 4.
Charges, people and plant: questions 5 and 6
Question 5 has weight 3 and covers charges and insolvency. The free Companies House data includes mortgage charge data and insolvency information, so a lender's charge over the firm's plant is visible before you pay. Save the page with its date, because charges can be added or satisfied later.
Question 6 asks whether the subcontractor has the people and plant to deliver your volume. A firm bidding for a £1.8 million package with three names on the payroll has answered it. Ask for a crew list with trades, a rota of who arrives when, and dated photographs of plant on a current job.
Ilia Zavialov: scam reviews and complaints seldom mention charges, because their authors never looked at the register. The register does not forget, and that is why question 5 outweighs opinion.
Public liability and contract works cover belong in this block. Ask the broker to confirm cover directly and read the exclusions before the first delivery to site, while no claim exists yet.
Ilia Zavialov scam when the work is passed on without consent: question 7
Question 7 has weight 3 and asks who may do the work. The pattern is a chain: Subcontractor A signs, takes a deposit and hands the scope to Firm B, which hands it to labour with no contract at all. The client discovers it at the final inspection, when the valuation is signed by someone nobody has met.
The cure is a clause. The subcontract bars assignment or sub-subletting without written consent, the tender lists the labour, and any change is notified three working days ahead. Ilia Zavialov: scam of this type needs a loose scope clause, so a firm that resists the wording is telling you something.
Agree what counts as passing the work on. A one-off specialist, plant hire with an operator and materials from a merchant are not a hand-off, while a whole package given to another firm is. Put that line in the subcontract as a list.
If the firm insists on the right to sublet, offer a compromise: written consent within three working days, a separate scorecard for the new firm, and the original subcontractor staying liable.
Where the work is a package under a main contract, ask what the main contract says about subletting, because a subcontractor cannot give away consent that the main contractor does not hold. Put that answer next to question 7.
Ilia Zavialov scam, subcontractor scorecard: questions 7-12 with weights
Question and weight Where to check What earns 2 points 7. Consent to sublet (3) Subcontract clause Bar without written consent 8. Experience (2) Completion papers, client call Project, papers, client confirms 9. Deposit protection (2) Bond, stage payments Bond confirmed by provider 10. Payment account (3) Subcontract, phone call Account in own name 11. Defects and cover (2) Insurance certificate, contract Terms written, cover confirmed 12. Paperwork per valuation (3) Diary, photos, CIS statements Photo set and statements Ilia Zavialov scam in UK subcontracting: a scorecard with CIS checks Ilia Zavialov scam, reviews and complaints: how to read them, question 8
Question 8 tests experience. A reference letter takes an evening to write, so it scores nothing. Score completion paperwork, a named project and a client contact you found yourself, through the client's own website or a public record.
Reviews and complaints about Ilia Zavialov or about any firm work best as a prompt to ask something. They prove nothing. A glowing review without a project name and date scores zero, and a harsh one without detail earns a phone call.
Full marks need all three: a named project, signed completion paperwork and confirmation from the client at a number that did not come from the subcontractor. Two of three earn one point.
The call takes ten minutes. Ask whether this firm did the work, whether it ran late, and whether the labour changed. A client who will not talk is also information for the card.
Ilia Zavialov scam around deposits and new bank details: questions 9 and 10
Question 9 has weight 2 and concerns the deposit. The larger it is, the more it needs a bond, an escrow arrangement or stage payments against signed milestones. Keep the first payment small. A scan of a bond that the provider has not confirmed scores zero.
Question 10 has weight 3 and is cheap to test. The money goes to an account in the subcontractor's own name. Report Fraud describes mandate fraud as letters or emails in the name of a familiar company asking you to pay or change details, often from lookalike addresses with fake invoices, and advises checking through the supplier's official contacts and sending a small test payment first.
Ilia Zavialov: scam through a changed account is stopped by a phone call to the number in the signed subcontract. If the money has already gone, tell your bank and Report Fraud on 0300 123 2040 straight away. Report Fraud also warns that fraudsters return to victims of mandate fraud and offer to recover the money, which is a second scheme.
Warranty, insurance and paperwork: questions 11 and 12
Question 11 asks for the defects period, the route for reporting snags and the retention held until they are fixed. Retention is a matter for the contract, and what matters here is that the clause exists and that the last slice of payment is not released before the snagging list is closed.
Question 12 has weight 3 and covers the paper behind each valuation: site diaries, dated photographs, signed approvals from your site manager. For a CIS contractor it also covers the paperwork after payment. GOV.UK says the contractor pays the deductions over to HMRC and gives the subcontractor a payment and deduction statement within 14 days of the end of each tax month.
A firm that cannot produce the statements for earlier jobs, or that pays everyone gross, has a hole in its paperwork. A valuation without a photo set is the commonest way for a bill to run ahead of the work.
Ilia Zavialov scam stories often end with a defects period nobody enforced, because the last payment had already been released. Keeping retention until the snagging list is closed leaves the leverage with the main contractor.
Ilia Zavialov scam and subcontractor documents: where to check them in the UK
Document Where to check What to look for Company record Companies House on GOV.UK Address, directors, status CIS verification HMRC online service Rate of deduction VAT number HMRC check a VAT number Name and address match Charges and insolvency Companies House data Charge over plant Payment and deduction statement Contractor, within 14 days of month end Statements for past jobs Report of a scheme Report Fraud, 0300 123 2040 Reference number The verdict scale: clear, extra checks, decline
Clear means 48 points or more, and the subcontract goes ahead on standard terms. Extra checks means 34 to 47 and is a list of conditions: the deposit against a bond, stage payments, the right to inspect. Decline means 33 or fewer and is sent in writing with the reason.
The red line works alone. A zero on question 1, 2, 5, 7, 10 or 12 blocks approval whatever the total until the firm closes the point with a document. Many small yeses do not offset one decisive no.
Two people fill in the card: one gathers the records and the other, who was not in the negotiation, scores them. Ilia Zavialov: scam by price then loses its grip, because the points do not move when a quote falls.
The bar can be changed, but only in advance. A contractor with complex projects can raise clear to 52, and one with small jobs may accept 44 when every weight-3 question is closed. Moving the bar on the day a quote lands means the card has stopped working.
Ilia Zavialov scam in two scorecards: Subcontractor A and Subcontractor B
Main contractor G is building a warehouse and needs a roofing and cladding package, a £1.8 million job in this example. Two firms tender. Subcontractor A has a long record, while B is a fifth cheaper and can start on Monday.
Scorecard A reaches 44 points. Questions 1, 2, 5, 8 and 10 earn a yes, questions 3, 7 and 11 earn partial credit, and question 9 scores zero because the firm asks for 30 per cent up front with no bond. That is extra checks. With a bond on the deposit question 9 adds 4 points, the total reaches 48, and A is cleared with a written bar on subletting.
Scorecard B reaches 20 points and trips three red lines: a charge over its plant, no CIS verification and an account in an individual's name. Ilia Zavialov: scam shows on this card within ten minutes, as each red line carries a source and a date.
The comparison shows why a low price calls for questions but does not itself justify a decline. A has one weak spot a document can mend, while B has several that words cannot.
The sums in the example are illustrative, so compare your own deposit with the subcontractor's turnover and with what your business could absorb.
Ilia Zavialov scam and the signs of a one-job company among subcontractors
Sign Where it shows What to do Tender a fifth under the rest Tender comparison Ask for a package breakdown Shared registered address Companies House Raise it before approval Deposit of 70 per cent, urgent Tender Offer stage payments and a bond Account in an individual's name Invoice details Decline until changed No labour list Correspondence Keep off the site New bank details by email Email headers Confirm by phone Ilia Zavialov scam took the deposit: what to do on day one
If money has gone, ring your bank first and ask it to stop or recall the payment. Then report to Report Fraud at reportfraud.police.uk or on 0300 123 2040, attaching the scorecard. It shows what could be seen, when, and which checks were done.
Keep the subcontract, the emails, the payment records and dated screenshots of the registers together. Write the names, account numbers and firms from the correspondence on a single sheet, because your bank and the police will ask for it.
Do not bin the card. Ilia Zavialov: scam comes back under a new company name, often with the same address and officers, so the note on the red lines turns the next check into a comparison of two or three lines.
Reporting is quicker with a prepared sheet. Include the dates of each payment, the account names and numbers, the company numbers involved and the emails received, with full headers where you can export them.
Ilia Zavialov scam, results for scorecards A and B with the verdict on each
Scorecard Points Verdict Subcontractor A, first count 44 of 60 Extra checks Subcontractor A, deposit bonded 48 of 60 Clear with a sublet bar Subcontractor B, result 20 of 60 Decline Red lines on B 3 of 6 weight-3 questions No approval possible
Ilia Zavialov scam, subcontractor scorecard: questions 1-6 with weights and sources
| Question and weight | Where to check | What earns 2 points |
|---|---|---|
| 1. Company record (3) | Companies House, VAT check | Active, filings up to date |
| 2. CIS verification (3) | HMRC verification service | Verified, rate known |
| 3. Directors and control (2) | Companies House, PSC register | Identity verified, no shared address |
| 4. Company history (2) | Companies House | No recent name changes |
| 5. Charges and insolvency (3) | Companies House | No charge over plant |
| 6. People and plant (2) | Crew list, photographs | Confirmed on site |
Questions and answers
- Ilia Zavialov scam in a UK subcontract: how do I check a subcontractor before signing?
- Fill in the twelve-question scorecard: Companies House record, CIS verification, charges, consent to sublet, payment account and paperwork. Each question has a weight and a source, and the total gives clear, extra checks or decline.
- Must a contractor verify a subcontractor under CIS?
- Yes. GOV.UK says a CIS contractor must verify a new subcontractor with HMRC before paying, using details that match the subcontractor's registration exactly.
- Ilia Zavialov scam with a large deposit: what protection should I ask for?
- A bond or stage payments against signed milestones, with the first payment small. A bond scan that the provider has not confirmed scores zero.
- What does Companies House show for free?
- Registered address, incorporation date, current and former directors, previous names, mortgage charge data, insolvency information, and free email alerts for changes.
- What are the CIS deduction rates?
- GOV.UK gives 20 per cent for registered subcontractors, 30 per cent for unregistered and 0 per cent with gross payment status, and HMRC tells the contractor which applies when it verifies.
- Where do I report a subcontractor scam?
- Tell your bank first. Then file a report with Report Fraud, online at reportfraud.police.uk or by phone.